On September 27, 2023 a
Exhibit,Appendix
was filed
involving a dispute between
Alice Von Knoblauch,
Brenda Hoefler-Kline,
Daniel H Mcclung,
Daniel M Hoefler,
Gene Cusano,
Joann M Hoefler,
Karl Von Knoblauch,
Lisa M Miles,
Nathan B Kline,
Phile Dilmore,
Rene Stobnicke,
Tara S Mcclung,
Virginia Cusano,
and
Hill Country Farm Brewery, Llc
D B A Heritage Hill Brewery,
Palladino Farms, Llc,
Town Of Pompey Planning Board,
for Special Proceedings - CPLR Article 78
in the District Court of Onondaga County.
Preview
FILED: ONONDAGA COUNTY CLERK 01/25/2024 05:39 PM INDEX NO. 010619/2023
TOWN OF POMPEY
NYSCEF DOC. NO. 68 RECEIVED NYSCEF: 01/25/2024
CODES ENFORCEMENT OFFICE
TIM BEARUP
TYLER JOHNSON
8354 U.S. ROUTE 20
Code Enforcement Officer 13104
Manlius, NY Deputy Code Enforcement Officer
By appointment Only
Phone (315) 682-1170 Fax (315) 682-8062
4/18/2023
Re: Palladino Farms Site Plan
Mr. Palladino,
After Monday's review at the Pompey Planning Board meeting, the members of the Board have some
comments and requests. Please make these adjustments to the site plan review prior to the next
meeting.
Relating to the stie plan, the Planning Board is requesting that the front row of car parking and
advertising signage, which is in the right-of-way of the road, be removed from the site plan. Also list the
number of related customer parking spaces, handicap spaces, as well as the number of employee
parking. Indicate which parking areas will be gravel and which to be paved. Please provide a timeline by
which the paved parking would be completed. All signage for parking, traffic flow and advertising should
be listed with location on site plan along with a detailed description of size, materials, colors, and
labeled with name of business. The planning board is also requesting a letter from the County Highway
Department, listing, and approving all driveway locations for new larger parking areas. A cut sheet
providing all exterior lighting, which should be dark sky compliant, should be provided with the site plan.
Please show on the site plan where portable bathrooms may be located when needed to serve the
public.
The Planning Board is also requesting, in writing, documentation of the daily operating hours of both the
proposed new business as well as the current business, Heritage Hill. Also provide expected delivery
times for each business, hours of music play, and expected times for permitted firework displays.
It has been suggested that a lot-line adjustment be added to the proposal to put the developed area all
one tax map number. Occupancy loads should also be placed on each building that is listed on the site
plan. Please set a time with the codes officer to assign each building a number for occupancy loads.
Tim Bearup
Town of Pompey
Code Enforcement Officer
FILED: ONONDAGA COUNTY CLERK 01/25/2024 05:39 PM INDEX NO. 010619/2023
NYSCEF DOC. NO. 68 RECEIVED NYSCEF: 01/25/2024
TOWN OF POMPEY
CODES ENFORCEMENT OFFICE
8354 u.S. ROUTE 20
Manlius, NY 13104
By appointment Only
Phone (315) 682-1170 Fax (315) 682-8062
Please provide a lot line adjustment map as discussed to show the developed area all one tax map
number.
The maps and submissions relating to these comments are subject to further review by the Planning
Board. Additionally, the Board awaits the comments of the county Planning Board from the GML
referral. Further comments relating thereto may be forthcoming.
Tim Bearup
Town of Pompey
Code Enforcement Officer
FILED: ONONDAGA COUNTY CLERK 01/25/2024 05:39 PM INDEX NO. 010619/2023
NYSCEF DOC. NO. 68 RECEIVED NYSCEF: 01/25/2024
TOWN OF POMPEY
CODES ENFORCEMENT OFFICE
8354 u.s. ROUTE 20
Manlius, NY 13104
By appointment Only
Phone (315) 682-1170 Fax (315) 682-8062
4/18/2023
Re: Palladino Farms Site Plan
Mr. Palladino,
After Monday's review at the Pompey Planning Board meeting, the members of the Board have some
comments and requests. Please make these adjustments to the site plan review prior to the next
meeting.
Relating to the site plan:
- The row of parking in the Road ROW must be removed from the plan as well as the sign that
is in the ROW.
- Also list the number of related customer ADA accessible as well as
parking spaces, spaces,
the number of employee parking.
- Indicate on plan which areas will be gravel and which to be paved.
parking
- All signage for traffic flow and advertising should be listed with location on site plan
parking,
along with a detailed description of size, materials, colors, and labeled with name of
business.
- Please provide a letter from the and approving all
County Highway Department, listing,
driveway locations for new larger parking areas.
- A cut sheet all exterior which should be dark should be
providing lighting, sky compliant,
provided with the site plan.
- Please show on the site plan where portable bathrooms be located when needed to
may
serve the public.
- loads should also be placed on each that is listed on the site plan. Please
Occupancy building
set a time with the codes officer to assign each building a number for occupancy loads.
The Planning Board is also requesting written outline as to specific operations matters including but not
limited to daily operating hours of both the proposed new business as well as the current business,
Heritage Hill.; expected delivery times for each business, hours of music play, and expected times for
firework displays.
Please provide a timeline by which the paved parking would be completed and time line for
commencement and completion of any other improvement on site.
Document Filed Date
January 25, 2024
Case Filing Date
September 27, 2023
Category
Special Proceedings - CPLR Article 78
For full print and download access, please subscribe at https://www.trellis.law/.